Environmental Dimension

Quality, environmental, and occupational health & safety policy and Practice

Energy Absolute Public Company Limited and subsidiary companies (“Company”) is committed to develop management standards. and conducting business along with sustainable environmental management Company concerned importance to safety hygiene and working environment and have social responsibility. This policy covers operations and employees of the company and encompass measures refer in Occupational Health & Safety Commitments. In addition, the company also places importance on resource management. It covers business activities, products, transportation, distribution of products, services, as well as environmental pollution and waste management, and in every step continuously. From the period before acquiring assets, mergers and acquisitions. Including planning, design, and operations in addition, this commitment is a direct duty and responsibility of all executives and employees and will be conveyed to suppliers, partners as well as recipients of relevant stakeholders.

  • To be a leader in alternative energy business, electric vehicle business and battery for electric vehicle by using the modern technology and environmentally friendly for the best benefit of shareholders.

  • To comply with all applicable quality health safety and environmental laws and regulations as well as other business operation and stakeholder requirements environment.

  • Create customer satisfaction in terms of the services, quality, safety, and on-time delivery of all products.

  • Prevent, minimize, and protect impacts from our operations on the environment and communities set targets and objectives to reduce environmental impacts while supporting a wide range of human and social development initiatives.

  • Setup goals, both qualitative and quantitative, to reduce risks or losses to life, property, and ensuring safe and healthy workplace environments to prevent injuries to employees, contractors, and stakeholders. Allocating sufficient and appropriate safety equipment and tools for workers to continuously improve and achieve safety goals.

  • Control, prevent, and mitigate occupational health risks and promote the health of employees, communities, and stakeholders while protecting personnel, assets, and data from threats through risk assessment and implementation of safety standard.

  • Measures to raise awareness among stakeholders, both internal and external including training for employees to understand the impacts of their work activities on the environment.

  • Continually improve our processes, operations, and internal company management system.


2024 Performance/Success Indicators

The Company strictly complies with relevant environmental laws and regulations. From 2019-2024, there were no environmental violations and the Company has not paid any significant fines (Environmental Violations Fine since USD 10,000 or more) related to environmental issues.


Waste Management

For waste management, The Company has implemented environmental policies in waste management through planning as a bottom-up approach, commencing with a decrease in resource consumption, in accordance with the organization’s goals that encourage the most efficient use of resources. Including reducing the amount of waste generated in order to lessen the burden of waste disposal resulting from the company's business operations and activities.


Management Approach

Under the Quality, Environmental, and Occupational Health & Safety Policy, the Company has initiated waste management as a practical approach to reducing the negative impacts on the communities and the environment. Also, the Company focuses on reducing the amount of waste in the process and recycles it to reduce the waste generated by management. The Company has constantly implemented waste management projects such as relocating solar panels that are decreasing in efficiency to other areas of the Company’s Group or communities, etc. In addition, the Company has established a waste management procedure that covers the management of waste and hazardous waste generated by the Company's production processes or activities, as well as the control of the sorting process/type of waste and hazardous waste, and proper waste and hazardous waste disposal.

In addition, the Company has established waste management guidelines. From previous operations, the Company has established waste management practices and implemented the 3Rs (Reduce, Reuse, Recycle) strategy by focusing on reducing, reusing, and recycling. Besides that, the Waste Management Procedure has been reviewed on a regular basis, and awareness among employees in the organization about excellence in environmental management and the commitment to complying with relevant laws has been established in order to lead to sustainable business development. By organizing the “3Rs Campaign Communication”, which focuses on reducing, reusing, and recycling, the Company has campaigned and cultivated the cost-effective use of resources for its employees and personnel. The Company has a management process in place as well as cost-effective resource utilization and regular control and follow-up.


Performance results/success indicators


Biodiesel business
2020 2021 2022 2023 2024
Total waste generation (Tons) 10,407.20 10,287.41 9,189.57 8,814.50 9,786.80
Hazardous waste generation (Tons) 322.12 266.84 242.52 220.79 278.60
Non-hazardous waste generation (Tons) 10,085.08 10,020.574 8,947.05 8,593.71 9,508.20

Renewable energy power plant business
2020 2021 2022 2023 2024
Total waste generation (Tons) 219.02 130.02 137.66 13,812.29 875.46
Hazardous waste generation (Tons) 134.44 42.16 34.12 13,726.38 801.87
Non-hazardous waste generation (Tons) 84.58 87.86 103.54 85.91 73.59

Battery and commercial electric vehicle business
2022 2023 2024
Total waste generation (Tons) 2,001.29 3,566.42 1,115.06
Hazardous waste generation (Tons) 603.94 828.70 426.12
Non-hazardous waste generation (Tons) 1,397.35 2,737.72 688.94


Reduce Waste Project

Biodiesel Business

The Company to reduce dirt in wastewater from glycerin tower is implemented with the use of filter press so that filtered water can be reused in the production process. The project helps reduce treatment of wastewater from the production process by 60 tons per month, hence a decrease of wastewater treatment expense by 54,000 baht per month.


Energy management

The company has Energy management guidelines by developing an appropriate energy management energy management system. The operating guidelines are setting goals and creating energy projects for the reduction of fuel and electricity consumption control to be in the appropriate amount for the operation. 2024 Performance/ Measurements


2024 Performance/ Measurements

The company has an Energy Conservation Policy announcement, a summary of the annual report on Energy management by setting goals and creating energy projects for the implementation of fuel consumption control to be in the appropriate amount for the operation.


Reduce Energy Project

Biodiesel Business
  • The project to reduce coal consumption from cleaning the steel walls in contact with water using chemicals for a 16-ton boiler, which resulted in a reduction of coal usage by 131,220.21 kilograms per year, or 131.22 tons per year

  • The project to Replace Cooling Tower Fan Blades by changing the material from aluminum to FRP (Fiberglass Reinforced Plastic) material of the cooling tower fan blades, electricity consumption has been reduced by 126,327.96 kWh.

Renewable Power Business
  • Solar Panel Installation Project on Rooftops Solar panels have been installed on the rooftops of office buildings, parking lots, and warehouse facilities within the company Nakhon Sawan, Phitsanulok, Chaiyaphum, Lumpang and Nakornsrithammarat. This initiative aims to reduce external electricity consumption to 382,158.10 kWh.

  • Floating Solar Panel Project Floating solar panels have been installed on the solar power plant Lopburi province water reservoir, contributing to the reduction of external electricity consumption to 34,256.80 kWh.


Battery and Commercial Electric Vehicle Business
  • Solar Panel Installation Project on Rooftops Solar panels have been installed on the rooftops. A total of 2.849 MW of solar panels have been installed on the roof of the production building within the company. These are used in the production process and the energy storage system (ESS) of the factory, which can reduce the use of external electrical energy by a total of 1,570,676.30 kilowatt-hours (kWh).

  • LiBr Absorption Cooling System Installation Project The LiBr absorption cooling system (Absorption chiller LiBr) with a capacity of 500 tons of cooling has been installed to utilize the excess steam generated from the boiler’s steam production as energy to drive the absorption cooling system. This reduces the electricity consumption of the cooling system (Chiller), which supplies cooling to the air conditioning system in the main production building and the utility production building. As a result, electricity consumption has been reduced from 7,959,285.12 kilowatt-hours (kWh) to 7,359,050.58 kilowatt-hours (kWh), resulting in an overall energy savings of 600,234.54 kilowatt-hours (kWh) or 7.54%


water management

The Company has a guideline for water management resulting from its operations by reusing the used water to reduce the amount of water used. In addition, the company has an action plan to turn the treated wastewater into good quality water for use in the green areas such as watering the plants at the factory to replace the use of tap water, including campaigning and promoting the use of resources in a cost-effective manner and maximum efficiency. Although some of the Company’s projects are located in a water-stressed area, no huge amounts of water are consumed and affect the stakeholders. The project also has a stakeholder-focused water management plan in place.


2024 Performance/ Measurements

In 2024, there were no water-related incidents with a financial impact above USD 10,000.


Reduce Water Project

Biodiesel business

For 2024 performance, the amount of water used in the production process is 110,680 cubic meters and the amount of recycled water is 4,824 cubic meters from the operation of 2 projects, as shown below:

  • Project on use of blowdown water from cooling tower to replace pipe water in the fire-fighting system: The project helps reduce pipe water consumption by 3,024 cubic meters or 9.72% of water required to be filled in the cooling tower.

  • Project on reuse of treated water for plant cleaning: The project reduces use of pipe water by 1,800 cubic meters or approximately 2% of total pipe water consumption of the plant.

Battery and Commercial Electric Vehicle Business
  • The project to reduce water used by standardization of Electrical Conductivity (EC) parameter in Water Rinse2 and Water Rinse4 in order to reduce the addition of DI water (water that passes through the deionization process), which can reduce the amount of tap water used to produce DI water by 50.4 cubic meters/month.

  • Car Body and Parts Surface Cleaning System Project before EDP Coating Process by enhancing the quality of the work pieces after the coating process, the water consumption in DI water production has been reduced by 878 liter/ 1 vehicles.


Air pollution Management

Results of air quality measurement in the solar power plant area

The company has guidelines for managing air pollution. The amount of air pollution has been monitored and monitored to ensure that it is in accordance with the law, not exceeding 0.33 milligrams per cubic meter (0.33 mg/m3).


year TSP measurement results
ESL ESP ESN ESLO
2019 0.029 0.062 0.053 0.25
2020 0.056 0.041 0.056 0.056
2021 0.025 0.039 0.037 0.026
2022 0.036 0.045 0.031 0.052
2023 0.043 0.142 0.095 0.043
2024 0.33 0.021 0.067 0.049

TSP : Total suspended particles

ESL : Solar Power Plant, Lampang Province

ESP : Solar power plant Phitsanulok Province

ESN : Solar power plant Nakhon Sawan Province

ESLO : Solar power plant Lopburi Province